Gray clapboard home with a columned porch, brick approach and broad autumn lawn beneath a mature white oak.

The Rowing Boathouse Search Has Moved One Footbridge From Easton Village

November 12, 2026

At 5:30 on a Monday, Wednesday or Friday morning, from April through November, Eastern Shore Community Rowers puts its shells on the Tred Avon for two hours of coached rowing with a chase boat following behind. The club calls its launch site a boatyard, and it sits at 770 Port Street, on the Easton Point side of the river. From the Easton Village side, the boats are part of the morning view.

Since 2016, rowers have been trying to get a boathouse built on this stretch of river. In September 2026 the plan moved to a new site. It now sits on town parkland at Easton Point Park, where the pedestrian bridge from Easton Village comes ashore. A project that once belonged to one private campus has become a public park decision, made in front of the Parks Advisory Board and the Town Council.

Saturday's Scrimmage Ends the Club's Race Calendar

The next good chance to see both clubs on the water together is this Saturday, November 14. Eastern Shore Community Rowers lists a fall scrimmage at Easton Point that day against Freedom Rowers. It is the last event on the club's 2026 schedule. The two clubs opened the season with a spring scrimmage at the same spot on May 9. In between, ESCR raced away from home at Capital Sprints in Washington, the Head of the Christina in Wilmington, the Head of the Schuylkill in Philadelphia and the Head of the Occoquan in Fairfax Station, Virginia.

The two clubs serve different rowers. Eastern Shore Community Rowers is the adult and masters club, open to anyone 18 or older, and rows both sculling and sweep. Freedom Rowers is a co-ed junior rowing nonprofit that usually has 30 to 40 rowers in a season. Chloe Allen is its executive director and head coach.

ESCR's weekly schedule shows when shells are most likely to be on the water:

Day Time Session
Monday, Wednesday, Friday 5:30 to 7:30 a.m. Coached rows with chase boat
Tuesday and Thursday 7:30 to 9:30 a.m. Recreational rowing
Saturday 7:00 to 8:30 a.m. Recreational rowing

Experienced rowers can also set up ad hoc sessions and open rowing through the club. The club's river season runs through November and starts again in April.

Where the Boats Live Now

The rowers' home at 770 Port Street is the waterfront property of Evergreen, a health and wellness organization founded in 1993. A few years ago the Star Democrat reported that Evergreen planned to build a large boathouse for the rowing clubs at the edge of that four-acre property along the Tred Avon. The paper described a building of about 12,000 square feet, made of cross-laminated timber and overlooking the river, with room to store the clubs' 60-foot shells indoors. At the time, the two clubs had close to 80 rowers between them. The estimated cost was around $5 million. Local architect Mitch Hager was designing it, along with a living shoreline.

According to the same report, the idea came from the executive director of Eastern Shore Community Rowers in 2016, and the grounds were meant to be open to the public. Freya Farley, Evergreen's board chair, told the paper what she hoped the project would give Port Street:

"beautiful open green space (to) a part of that community."

That plan placed the boathouse on Evergreen's own land. The plan in front of the town this fall uses a different site.

The Plan Moved Onto Town Land in September

The Easton Town Council's agenda for September 8, 2026 included Resolution No. 6227. It authorized a memorandum of understanding with Freedom Rowers, Inc. and Eastern Shore Community Rowers, Inc. for a boathouse and related facilities at Easton Point Park. Talbot Spy reported that council members supported the idea and approved the agreement.

Two weeks later, at the Parks Advisory Board's September 22 meeting, Town Engineer Rick Vandenberg called the proposal conceptual, according to Talbot Spy's coverage of that meeting. As described there, the pieces were:

  1. The site. The town would provide land at Easton Point Park.
  2. The building. A boathouse for rowing shells, with public restrooms possibly built in.
  3. The water. A pier.
  4. The design. The rowing organizations would develop it themselves.
  5. The review. The project would go through the town's process, likely including the Planning Commission and the Parks Advisory Board.

Board members asked for more detail on the agreement and asked Chloe Allen, Freedom Rowers' executive director and head coach, to come to a future meeting and explain the clubs' plans. Talbot Spy reported that the final design and the details of the arrangement were not yet settled. The paper ran an earlier Easton Point concept drawing by Mitch Hager with the story and noted that final plans had not been approved.

So the same architect, the same clubs and the same basic building have moved from a private campus to a public park. That changes who gets a say and where the conversation takes place.

A Park Built on the Old Fuel Dock

Easton Point Park looks settled now, but the land had a long industrial life first. Speaking to WBOC, project manager Kody Cairo listed what it had been: the town dump for a while, a transfer station for the oil that heated and powered Easton, and a site of the town's public works department. A fuel barge used to come up the Tred Avon to unload into large storage tanks. The town ran soil tests and worked with the state to make sure the site was safe for a park.

The Town of Easton's 2026 Comprehensive Plan describes Easton Point as a triangular peninsula with the Tred Avon on two sides. A small marina and a heavily used public boat ramp sit at its tip, and several industrial businesses nearby still take bulk deliveries by river. Easton Point Marina is at 975 Port Street and offers slips, land storage and ethanol-free fuel year-round.

The town's facility page lists the park's features as benches, a kayak launch, picnic areas, trails, a water fountain and waterfront access. The Comprehensive Plan, dated February 19, 2026, treats the park as unfinished. It calls for continuing the build-out with a new boat ramp, a living shoreline, a boardwalk or promenade, and a parking area. A boathouse and pier would join that list of planned additions.

The Footbridge Puts Easton Village at the Far End

This is where the park question reaches Easton Village. The town's park inventory lists the Easton Village Trail as a 1.02-mile walking trail that includes the pedestrian bridge to Easton Point. The Comprehensive Plan notes that Easton Village's developers paid for that bridge over the Tred Avon. It also names the bridge as the route for a westward trail connection that could one day continue toward St. Michaels.

On the town side, the plan lists another trail priority: extending the rail trail through Moton Park, across Route 322 at Glenwood Avenue, to the bridge at Easton Point Park and Easton Village. If that link is built, the footbridge stops being the end of a neighborhood loop and becomes a junction. The rail trail would come from downtown on one side, the Easton Village Trail would come from the other, and the park and any boathouse would sit where they meet.

The plan is candid that Easton Point's long-term future is still open. It says many stakeholders want to move away from heavy industrial use toward recreation, public waterfront access, parks and mixed-use development. A permanent rowing home would be one of the first buildings to push the point in that direction, at the end of a bridge that Easton Village already crosses on foot.

For more on how Easton Village's own streets and parks passed from the developer to the town, see our earlier look at what changes as Easton Village reaches build-out.

Before the Boats Go Back In

Once the November 14 scrimmage is over, the boathouse moves forward on paper rather than on the water. Talbot Spy's reporting points to the next steps: the clubs present their plans to the Parks Advisory Board, the rowers develop a design, and the project goes through the town's review, likely including the Planning Commission. The town posts agendas and meeting video on its Agendas and Minutes page.

Anyone thinking about getting in a boat themselves has a model in this year's calendar. In 2026, ESCR held free information sessions on two Saturday mornings in April. Learn-to-row clinics followed in late April and mid-May, each with four weekday evening sessions and a Saturday morning. The clinics cost $400 per person, with $200 of that credited toward membership for people who joined, and the club invites questions about scholarship funding. Freedom Rowers takes sign-up questions for its junior program through its coach, whose contact details are on the team's site.

When the shells go back on the Tred Avon in April, they will still launch from 770 Port Street. The decision about where they eventually live will be made at Easton Point Park.

Easton Point has gone from fuel tanks to footpaths, and the boathouse would be its next chapter. If you'd like to talk about what the park and the bridge could mean for your corner of Easton Village, Coard Benson is glad to share what he's watching on Port Street. Let's Connect.

Personalized Service. Trusted Guidance.

From waterfront properties and luxury homes to everyday residential transactions, you'll benefit from personalized service, local insight, and a commitment to delivering exceptional results every step of the way.